Answer (1 of 20): Quantity of steel is not dependent on the volume of concrete, but on the structure where it is being used. Slabs: 0.7 to 1.0%, Beams: 1% to 2%, Columns: 1% to 5% It may vary depending upon the loading condition as well …

🕑 Reading time: 1 minute Quantity of materials such as cement, sand, coarse aggregates and water required per cubic meter of concrete and mortar for different mix proportions varies with the mix design of the concrete and mortar respectively. Following table gives the estimated quantity of materials required per cubic meter of mortar and concrete for various nominal …
None. Concrete may be formed without metal.If you are reinforcing the concrete with rebar then it depends on what loads the reinforced concrete will have to bear, the dimension of the rebar, the safety factor involved, and lots of other geometric factors.Steel bars quantity will be according to structure element; but a (very) rough average of 120 KG per cubic meter.
Quantity of cement required for 1 cubic meter of m10 concrete:- considering, 1440kg/m3 is density of cement, then cement quantity = (1/10) ×1.54m3 × 1440 kg/m3 = 222kg or around 4.44 bags 50 kg of cement. ... 666 kg sand, 1332kg aggregate and about 220 litres of water and 100kg of steel embedded in it as per design structure in case ...
Deformed Mild Steel Bar for Concrete Construction Reinforcing. Hot rolled deformed bar Grade 40 is a popular building material for export BS standard or other international standard meeted The minimum elongation is 12 major sizes as following Hot Rolled Deformed Bar of 16mm diameter in 6 meter length used in concrete construction Reinforcing deformed steel bar of …
How May Tons Of Rebar Per Cubic Meter Of Concrete. average of 0.12tons of rebars per cubic meter of concrete. How May 100 Th Of Rebar Per Cubic Meter Of Concrete. what does steel weigh for a cubic meter 4.8 - 8219 Ratings The Gulin product line consisting . how may tons of rebar per cubic meter of concrete.
Method-2 : Reinforcement Estimation (Accurate Method): This is the most accurate method for quantity estimation of reinforcement. This method requires the drawings and schedules. The drawings used in this estimation are the representative of actual structure. The sketches include the intended form of detailing and distribution of main and ...
How much steel is required for 1 cubic meter concrete? - Quora. You may require the following quanties of steel reinforcements per one cum of cement concrete which is expressed in kg:- 1Column footings 75 kg use 10 or 12 mm dia rods 2Grade beams 100kg use 12,16 mm dia rods -85%; 8 and 6mmdia rods -15% 3Plin....
how many steel is required for 1 cubic meter of concrete, how many steel is required for 1 cubic meter of concrete in zambia Example calculation Estimate the quantity of cement sand and stone aggregate required for 1 cubic meter of 124 concrete mix Ans Materials required are 7 nos of 50 kg bag of cement 042 m 3 of sand and 083 m 3 of stone ...
How many kg of steel for one cubic meter of concrete? 31-03-2017 0183 32 How many kg of steel for one cubic meter of concrete? Register now or log in to answer,See more Typical average weight of reinforcement kg/m3 in concrete building elements The below figures are for guideline only and may vary for different projects Concrete building element Weight of …